PawHut 3 Tier Wooden Hamster Cage With Hut, Wheel, Ramps, 80 X 50 X 84 Cm

Save 6%
PawHutSKU: 6056971

Price:
Sale price£89Was: Regular price£95
Stock:
In stock
Standard Delivery from £4.99 - 2-3 working days.
Refund Policy
Rated Excellent by Customers on TrustPilot

Description

Provide your small pets with a spacious home in this PawHut three-tier hamster cage. Constructed from secure, natural fir, this cage includes essentials like a hut, wheel and ramps, allowing your pets to relax, explore and exercise. Removable front panels make cleaning and setup easy, while the clear window lets you watch them inside their space. Its multi-channel design ensures excellent airflow and easy movement. Stylish, secure and complete.


• Three-tier design with a hut, wheel and ramp for roaming, relaxing and exercising

• Made from natural fir wood and pet-friendly water-based paint

• PS transparent panel for a clear view

• Removable panels for easy cleaning and interaction

• The passage between the upper and bottom levels can be closed to create separate spaces

• Suitable for dwarf hamsters, syrian hamsters, gerbils and rats

• Assembly required

• Colour: Grey

• Material: Fir wood and PS

• Overall dimensions: 84H x 80W x 50D cm

• Top level: 20H x 76W x 26D cm

• Middle level: 25H x 76W x 26D cm

• Bottom level: 31H x 76W x 46D cm

• Door hole: 10L x 10W cm

• Hut: 16.5H x 24W x 20D cm

• Hut door: 9.5H x 7W cm

• Ramp: 40L x 12W cm

• Running wheel: 21 x 6.5D cm

• Item label: D51-499V01GY

Recommended for you

Recently viewed